News
Edition May/June 2025
Blocks, partition walls, partition walls, and vibratory tablets. We'll beat any price.
Dock design and construction, Coastal erosion control, Port maintenance, Geotubes (sale and installation).
For your construction project. Legal certainty for your collective bargaining agreement with the Federal Labor Center.
Fire protection systems, Air conditioning, Waterproofing, Epoxy paint, Civil works.
Complete line of emergency safety solutions and products.
Residential, industrial, commercial, and bridge construction. Maximum height 24 m. Complete consulting services. Turnkey.
Drilling for micropiles: Triaxial $800, Consolidation $1,500.
Ultrasonic thickness measurement, Perimeter noise determination, Earth measurement.
LA Self-Drilling Screw, LA Self-Tapping Screw. Stainless steel head with integrated neoprene washer option.
In the form of a high-performance paste, which does not harden, is non-oxidizing and does not form a curing film.